Industrial Staircase Installation Timeline — From Survey to Handover
Typical timelines: small jobs 3–6 weeks, medium 6–12 weeks, large projects 12+ weeks.
Pre-installation
Site visit, measurements, shop drawings and approvals.
Fabrication
Cutting, welding, assembly and quality checks, followed by surface treatment.
Delivery & installation
Logistics planning, site prep, crane/lift requirements, anchoring and commissioning.
